Saturday, July 03, 2004

Plumber Day 2

Today continued with the installation of new basin.
1) Place the bracket on the wall, to mark the holes
2) Drill the holes
3) Hammer in the flush for support
4) Secure the basin on the new brackets
5) Remove old pipes, if need saw off.
6) Measure and saw pipes of required length
7) Install new pipe.
8) Secure the connectors with tape

Done

Easy as ABC "LIKE REAL"

No comments: